Tunnel at 4 stations for shoe ironing after the lasting
The process is divided into 2 separate times but in succession:
- humidification (% of moisture adjustable)
- ironing (air temperature from 0° to 200°)
- steam generator and boiler stainless
- temperature digital-control
- 10 machining programs differentiated where to set:
the temperature, the feed rate, the staying time in the tunnel.
RS - Cooling device at room temperature at the exit of the tunnel.