It is a cement-based siding plaster. APPLICATION STAGES:
The surface must be clean and strong.
Surface must be dampened.
All mortar should be added to 5.5-6 liters of water and mixed for 5 minutes.
After resting for 5 minutes, mixed mortar is applied. But just before applying it should be mixed again.
Mortar full drying time is 2-3 days.
WARNINGS AND RECOMMENDATIONS
• Materials previously prepared and begun to harden should not be added to new mixture.
• Can't be left as a finish coat. Once surface gets dried it should be painted with silicone enhanced exterior paint.
• Should not be applied on surfaces which are frozen, melting or has a danger of frost within 24 hours.
Refer to Persan's Technical Services of Building Elements.
Technical Properties | MINERAL COVERING PLASTER |
Consumption | 3 kg/m3 depending on the surface |
Shelf Life | 1 year as of production date in a cool and dry place |
Application Temperature | +5oC / + 30 oC |
Areas of Use |
|